2000L Perfume Mixing & Filtration System for a U.S. Fragrance Factory Retrofit
Quick Project Facts
| Item | Project Detail |
| Industry | Alcohol-based fragrance production |
| Project Location | United States |
| Working Capacity | 2,000L |
| Project Type | Existing factory retrofit |
| Main Site Constraint | Equipment Transport Height Below 2,000 mm |
| Existing Site Integration | Tank #1 position with the original platform and staircase retained |
| Core Process | Pneumatic Mixing, Controlled Cooling & Two-Stage Filtration |
| Key Integration | Existing Factory Layout, Shared Controls & Customer-Supplied Weighing Interfaces |
Project Overview
A U.S. fragrance manufacturer required a custom 2000L perfume mixing tank and filtration system for alcohol-based production. The new tank had to be installed at the existing Tank #1 position while retaining the factory’s original platform and staircase arrangement.
Instead of supplying a standalone vessel, HONEMIX configured the tank as the core of a coordinated perfume processing system combining pneumatic mixing, controlled cooling, primary and polishing filtration, electrical-control integration, and preparation for the customer’s specified weighing interfaces.
The project was developed from the standard HPM-EX 2000L perfume freezing, mixing and filtration system, then adapted around the customer’s actual factory access, existing equipment, site utilities and installation requirements.
The engineering priority was therefore both process performance and installation feasibility: 2,000L working capacity, access through a sub-2,000 mm entrance, integration with the existing production area, and practical placement of the cooling and filtration modules.
Customer Requirements
The customer was producing alcohol-based fragrance products and needed a larger batch-processing system without extensive rebuilding of the existing production area.
| Project Requirement | Customer Need | HONEMIX Engineering Response |
| Processing Capacity | 2,000L working batch capacity for perfume production | 2,000L working-capacity tank with approximately 2,200L total vessel volume |
| Alcohol-Based Fragrance Process | Process arrangement suitable for alcohol-containing products | Pneumatic agitation with project-specific electrical and installation considerations |
| Restricted Factory Access | Transport height below 2,000 mm after removable components were taken off | Removable legs and upper mixing components with an approximately 1,950 mm transport-height target |
| Existing Tank #1 Area | New tank installed while retaining the existing platform and staircase | Equipment dimensions and interfaces coordinated around the existing layout |
| Existing Equipment Integration | Adjacent existing tank remained part of the operating area | One combined control cabinet planned with provisions for both tanks |
| Customer-Supplied Weighing System | Mettler Toledo IND360 terminals and four-load-cell tank arrangement | Tank-leg mounting interfaces and control-panel positions prepared from confirmed dimensions |
| Site Power | 110V/60Hz single-phase and 220V/60Hz three-phase | Electrical design configured around the confirmed site power requirements |
| Cooling & Filtration | Controlled low-temperature treatment and multi-stage clarification | Internal 316L cooling coil, separate 30 HP refrigeration package, plate-and-frame filtration and cartridge polishing filtration |


Engineering Challenges and Solutions
1. Restricted Entrance Height
The factory entrance had a strict clearance limit below 2,000 mm. For this retrofit, vessel capacity alone was not enough—the equipment also had to pass through the building access route and reach the final Tank #1 position.
Engineering Response: HONEMIX reviewed both the operating configuration and the reduced transport configuration. The pneumatic mixer assembly and detachable tank legs were considered as removable components for installation.
Transport Target: The reduced configuration targeted an overall height of approximately 1,950 mm.
Buyer Value: Confirming transport dimensions before fabrication helped the customer evaluate access feasibility in advance and reduced the risk of unexpected site modification after delivery.
2. Retaining the Existing Platform and Staircase
The customer wanted to retain the existing platform and staircase around Tank #1. The new system therefore had to fit the available production area without compromising operator access, maintenance clearance or process connections.
Layout Coordination: HONEMIX reviewed the Tank #1 position, platform and staircase clearances, manway and product-inlet access, discharge-valve access, control-cabinet position, compressed-air connections and process-piping routes.
Modular Arrangement: The filtration unit and refrigeration package were supplied as separate modules so their final positions could be selected around floor space, ventilation, maintenance access and confirmed piping routes.
Buyer Value: The equipment layout was developed around the existing production area to help avoid unnecessary rebuilding, subject to final site verification.
3. Shared Controls and Weighing-System Interfaces
The new 2,000L tank needed to operate alongside the customer’s adjacent existing tank. The project therefore required coordinated controls and preparation for the customer-selected weighing system.
Control Cabinet: HONEMIX planned one combined cabinet with provisions for both tank control circuits, two Omron E5AC temperature controllers, customer-supplied Mettler Toledo IND360 weighing terminals, voltage monitoring, power indication, Schneider electrical components, refrigeration-control wiring and the required equipment interfaces.
Weighing Preparation: The tank-leg mounting interfaces were prepared according to the confirmed four-load-cell arrangement, and panel positions were reserved for the customer’s IND360 terminals.
Buyer Value: Preparing the mechanical and panel interfaces before fabrication helped reduce the need for field drilling, support modification and control-panel rework after delivery.


Control Cabinet & Pre-Fabrication Review
HONEMIX prepared the cabinet arrangement for the new 2,000L tank and the customer’s existing tank as one coordinated control area. The planned configuration included Schneider electrical components, voltage monitoring, power indication, refrigeration-control wiring and two Omron E5AC temperature controllers.
Before fabrication, the customer could review the functional-button layout, overall cabinet dimensions and relevant panel interfaces, including the positions prepared for the weighing terminals.
Installation Note: Final hazardous-location requirements, installation methods and any locally required approvals should be confirmed according to the actual site classification and applicable regulations.

2000L Perfume Processing System Configuration
Raw Material Charging → Pneumatic Mixing → Controlled Cooling → Temperature Holding → Plate-And-Frame Filtration → Cartridge Polishing Filtration → Transfer To Storage Or Filling



Planning a Similar Perfume Processing Project?
Share your batch size and layout. We’ll help configure the right system.
Project Drawings And Documentation
For an overseas factory retrofit, engineering drawings are part of the equipment solution—not simply supporting paperwork.
Mechanical Documentation: General arrangement drawings, tank dimensions, module-positioning proposals and tank-leg/load-cell mounting interfaces.
Layout Documentation: Factory-layout references showing Tank #1, the existing platform and staircase, control-cabinet position and planned equipment modules.
Electrical Documentation: Electrical schematic, control-cabinet functional layout, cabinet dimensions, temperature-controller interfaces and weighing-terminal panel provisions.
Process Documentation: Refrigeration and process-connection interfaces, technical specifications and spare/wearing-parts information.
Customer Value: Reviewing these drawings before fabrication helps confirm equipment access, installation clearance, panel location, utility interfaces and preliminary site coordination before shipment.

Scope Of Supply And Site Responsibilities
HONEMIX Scope: Customized 2000L mixing tank, pneumatic agitation system, internal cooling coil, filtration equipment, refrigeration package, combined electrical control cabinet and project-specific engineering documents according to the confirmed technical agreement.
Customer Site Scope: Final equipment locations, local utility connections, site piping, customer-supplied weighing equipment, final installation conditions and any hazardous-location classification or local approvals required for the facility.
Final Site Confirmation: The final positions of the refrigeration and filtration modules, together with copper-pipe routing and pipe length, were to be confirmed from the completed site layout and actual installation conditions.
Project Results & Engineering Outcomes
| Project Constraint | Engineering Solution | Project Result |
| Factory entrance below 2,000 mm | Removable legs and upper mixing components | Reduced transport configuration targeted approximately 1,950 mm |
| Existing platform and staircase retained | Tank layout coordinated around the Tank #1 production area | Helped avoid major rebuilding of the existing area, subject to final site verification |
| Existing tank remained in operation | Combined control cabinet planned for both tanks | New and existing equipment coordinated through one control concept |
| Customer-selected weighing system | Tank-leg and cabinet interfaces prepared from confirmed dimensions | Helped reduce on-site structural and panel modification |
| Limited space around Tank #1 | Filtration and refrigeration supplied as separate modules | Allowed final module positions to be selected around floor space, ventilation and service access |
Why This Project Approach Matters
For a perfume factory retrofit, tank capacity is only one part of the purchasing decision. Access dimensions, existing structures, utilities, weighing interfaces, maintenance space and process-module locations can be just as important as vessel volume.
Reviewing these conditions before fabrication helps turn equipment selection into an installation-ready project plan. This approach is particularly relevant when an operating fragrance factory needs additional capacity without rebuilding the entire production area.
Planning A Similar Perfume Production Project?
To start a quick project review, simply send us:
Required batch size
Product type
Factory layout or available space
If available, you can also share your cooling, filtration, voltage or existing equipment information.
For an initial discussion, batch size and a simple layout are enough for us to recommend a suitable configuration.
Project FAQ
1.Was This A Standard 2,000L Perfume Machine?
No. The project was developed from a standard 2,000L perfume processing concept, but the final configuration was adapted to the customer’s restricted access route, Tank #1 location, existing platform and staircase, combined electrical-control requirement and customer-supplied weighing-system interfaces.
2.How Was The Entrance-Height Restriction Addressed?
The tank used removable legs and removable upper mixing components. The project review targeted an approximately 1,950 mm reduced transport height to help meet the customer’s sub-2,000 mm access requirement. Final feasibility still depends on confirmed equipment dimensions, packing method, lifting method, route width, turning radius and actual site conditions.
3.Can One Control Cabinet Support A New And Existing Tank?
Yes, where the confirmed electrical design, site power, operating logic, interlocks and local safety requirements support the arrangement. For this project, one combined cabinet was planned with provisions for the new 2,000L tank and the customer’s adjacent existing tank.
4.Can The Tank Be Prepared For A Customer-Supplied Weighing System?
Yes. If the weighing-terminal model, load-cell arrangement and mounting dimensions are confirmed before fabrication, HONEMIX can prepare the tank-leg interfaces and reserve the relevant panel positions. This project was prepared for a customer-supplied four-load-cell arrangement and Mettler Toledo IND360 terminal interfaces.
5.Can The Chiller And Filters Be Installed Separately From The Tank?
Yes. The refrigeration package and filtration equipment were configured as separate modules. Their final positions can be determined according to actual floor space, ventilation, maintenance access, process routing and final utility conditions.
6.What Should Be Confirmed Before Ordering A Similar System?
Confirm the required working volume, product characteristics, alcohol content, target process temperature, cooling-time requirement, filtration target, factory-layout dimensions, entrance clearance, utility conditions, existing-equipment interfaces, weighing-system requirements and any locally applicable hazardous-location requirements.
Planning a 2000L perfume mixing, cooling and filtration project? Send your batch requirements and factory layout below. HONEMIX can review the configuration, site access and key equipment interfaces for the next engineering discussion.
Mob:+86-18688638225